Deliverables

WPDeliverableDescriptionLead BeneficiaryNatureDissemination LevelDelivery Date
WP1 D1.1 First Progress Report
Download Executive Summary
CIDReportPublic30/09/18
WP1D1.2Second Progress Report
Download Executive Summary
CIDReportPublic30/09/19
WP1D1.3Third Progress Report
Download Executive Summary
CIDReportPublic30/09/20
WP2D2.1KPI Key Performance Indicators Document
Download Executive Summary
PRIReportConfidential31/12/17
WP2D2.2ReFreeDrive testing vehicles: Driving Cycle
Download Executive Summary
PRIReportPublic31/12/17
WP2D2.3Functional subsystems Full Technical Specifications
Download Executive Summary
PRIReportConfidential28/02/18
WP3D3.1Preliminary IM Design Analysis and Material Selection
Download Executive Summary
MDLReportConfidential20/04/18
WP3D3.2CR-IM Electromagnetic Design Report for Inner and Outer Rotor
Download Executive Summary
MDLReportConfidential31/10/18
WP3D3.3CR-IM Thermal Design Report for Inner and Outer Rotor
Download Executive Summary
MDLReportConfidential31/03/19
WP3D3.4 CR-IM Full Design (including CAD) for Inner and Outer Rotor Designs
Download Executive Summary
MDLReportConfidential30/06/19
WP4D4.1SynRel Preliminary analysis
Download Executive Summary
IFPENReportPublic30/09/18
WP4D4.2SynRel Electro Magnetic Design Track 1 / Track 2
Download Executive Summary
UAQReportConfidential31/03/19
WP4D4.3PM SynRel Electro Magnetic Design Track 1 / Track 2
Download Executive Summary
IFPENReportConfidential31/03/19
WP4D4.4SynRel Full Design Track 1 / Track 2
Download Executive Summary
UAQReportConfidential30/06/19
WP4D4.5PM SynRel Full Design Track 1 / Track 2
Download Executive Summary
IFPENReportConfidential30/06/19
WP5D5.1Application software for IM and SynRel motor control
Download Executive Summary
UAQReportConfidential30/06/19
WP5D5.2High Power Range Electric Drive Design
Download Executive Summary
IFPENReportConfidential30/06/19
WP5D5.3Medium Power Range Electric Drive Design
Download Executive Summary
UAQReportConfidential30/06/19
WP5D5.4Technical High Power Powertrain Integration Description Document
Download Executive Summary
PRIReportPublic30/09/19
WP5D5.5Technical Medium Power Powertrain Integration Description Document
Download Executive Summary
PRIReportPublic30/09/19
WP6D6.1 Induction Machine with Die Casted Copper Rotor for 75kW of operationTCMOtherConfidential29/02/20
WP6D6.2Induction Machine with Fabricated Copper Rotor for 75kW of operationTCMOtherConfidential29/02/20
WP6D6.3Pure Synchronous Reluctance Motor for 75kW of operationMAVOtherConfidential29/02/20
WP6D6.4PM Synchronous Reluctance Motor for 75kW of operationMAVOtherConfidential29/02/20
WP6D6.5Induction Machine with Die Casted Copper Rotor for 200kW of operationTCMOtherConfidential29/02/20
WP6D6.6Induction Machine with Fabricated Copper Rotor for 200kW of operationTCMOtherConfidential29/02/20
WP6D6.7Pure Synchronous Reluctance Motor for 200kW of operationMAVOtherConfidential30/09/19
WP6D6.8PM Synchronous Reluctance Motor for 200kW of operationMAVOtherConfidential30/09/19
WP6D6.9Power Electronics for the 75kW power settingR13OtherConfidential30/09/19
WP6D6.10Power Electronics for the 200kW power settingIFPENOtherConfidential30/09/19
WP7D7.1Motor testing resultsIFPENReportPublic31/12/19
WP7D7.2Integrated e-Drive test bench testing results
Download Executive Summary
CIDReportPublic31/03/20
WP7D7.3In vehicle Technology Validation
Download Executive Summary
PRIReportPublic30/06/20
WP8D8.1Techno economic EvaluationECIReportConfidential30/09/20
WP8D8.2LCA technologies analyses
Download Executive Summary
CIDReportPublic30/09/20
WP8 D8.3Plan for the Exploitation of Results, first draft
Download Executive Summary
MAVReportConfidential31/03/19
WP8D8.4Plan for the Exploitation of Results, final draft MAVReportConfidential30/09/20
WP9D9.1Project Website
Download Executive Summary
CIDOtherPublic31/12/17
WP9 D9.2Open Data Management Plan
Download Executive Summary
CIDORDP: Open Research Date PilotPublic31/03/18
WP9D9.3Communication Plan
Download Executive Summary
ECIReportPublic31/03/18
WP9D9.4Plan for the Dissemination of Results, First Release
Download Executive Summary
UAQReportPublic30/09/18
WP9D9.5Plan for the Dissemination of Results, Mid Release
Download Executive Summary
UAQReportPublic30/09/19
WP9D9.6Plan for the Dissemination of Results, Final Release
Download Executive Summary
UAQReportPublic30/09/20
This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 770143