WP | Deliverable | Description | Lead Beneficiary | Nature | Dissemination Level | Delivery Date |
---|---|---|---|---|---|---|
WP1 | D1.1 | First Progress Report Download Executive Summary | CID | Report | Public | 30/09/18 |
WP1 | D1.2 | Second Progress Report Download Executive Summary | CID | Report | Public | 30/09/19 |
WP1 | D1.3 | Third Progress Report Download Executive Summary | CID | Report | Public | 30/09/20 |
WP2 | D2.1 | KPI Key Performance Indicators Document Download Executive Summary | PRI | Report | Confidential | 31/12/17 |
WP2 | D2.2 | ReFreeDrive testing vehicles: Driving Cycle Download Executive Summary | PRI | Report | Public | 31/12/17 |
WP2 | D2.3 | Functional subsystems Full Technical Specifications Download Executive Summary | PRI | Report | Confidential | 28/02/18 |
WP3 | D3.1 | Preliminary IM Design Analysis and Material Selection Download Executive Summary | MDL | Report | Confidential | 20/04/18 |
WP3 | D3.2 | CR-IM Electromagnetic Design Report for Inner and Outer Rotor Download Executive Summary | MDL | Report | Confidential | 31/10/18 |
WP3 | D3.3 | CR-IM Thermal Design Report for Inner and Outer Rotor Download Executive Summary | MDL | Report | Confidential | 31/03/19 |
WP3 | D3.4 | CR-IM Full Design (including CAD) for Inner and Outer Rotor Designs Download Executive Summary | MDL | Report | Confidential | 30/06/19 |
WP4 | D4.1 | SynRel Preliminary analysis Download Executive Summary | IFPEN | Report | Public | 30/09/18 |
WP4 | D4.2 | SynRel Electro Magnetic Design Track 1 / Track 2 Download Executive Summary | UAQ | Report | Confidential | 31/03/19 |
WP4 | D4.3 | PM SynRel Electro Magnetic Design Track 1 / Track 2 Download Executive Summary | IFPEN | Report | Confidential | 31/03/19 |
WP4 | D4.4 | SynRel Full Design Track 1 / Track 2 Download Executive Summary | UAQ | Report | Confidential | 30/06/19 |
WP4 | D4.5 | PM SynRel Full Design Track 1 / Track 2 Download Executive Summary | IFPEN | Report | Confidential | 30/06/19 |
WP5 | D5.1 | Application software for IM and SynRel motor control Download Executive Summary | UAQ | Report | Confidential | 30/06/19 |
WP5 | D5.2 | High Power Range Electric Drive Design Download Executive Summary | IFPEN | Report | Confidential | 30/06/19 |
WP5 | D5.3 | Medium Power Range Electric Drive Design Download Executive Summary | UAQ | Report | Confidential | 30/06/19 |
WP5 | D5.4 | Technical High Power Powertrain Integration Description Document Download Executive Summary | PRI | Report | Public | 30/09/19 |
WP5 | D5.5 | Technical Medium Power Powertrain Integration Description Document Download Executive Summary | PRI | Report | Public | 30/09/19 |
WP6 | D6.1 | Induction Machine with Die Casted Copper Rotor for 75kW of operation | TCM | Other | Confidential | 29/02/20 |
WP6 | D6.2 | Induction Machine with Fabricated Copper Rotor for 75kW of operation | TCM | Other | Confidential | 29/02/20 |
WP6 | D6.3 | Pure Synchronous Reluctance Motor for 75kW of operation | MAV | Other | Confidential | 29/02/20 |
WP6 | D6.4 | PM Synchronous Reluctance Motor for 75kW of operation | MAV | Other | Confidential | 29/02/20 |
WP6 | D6.5 | Induction Machine with Die Casted Copper Rotor for 200kW of operation | TCM | Other | Confidential | 29/02/20 |
WP6 | D6.6 | Induction Machine with Fabricated Copper Rotor for 200kW of operation | TCM | Other | Confidential | 29/02/20 |
WP6 | D6.7 | Pure Synchronous Reluctance Motor for 200kW of operation | MAV | Other | Confidential | 30/09/19 |
WP6 | D6.8 | PM Synchronous Reluctance Motor for 200kW of operation | MAV | Other | Confidential | 30/09/19 |
WP6 | D6.9 | Power Electronics for the 75kW power setting | R13 | Other | Confidential | 30/09/19 |
WP6 | D6.10 | Power Electronics for the 200kW power setting | IFPEN | Other | Confidential | 30/09/19 |
WP7 | D7.1 | Motor testing results | IFPEN | Report | Public | 31/12/19 |
WP7 | D7.2 | Integrated e-Drive test bench testing results Download Executive Summary | CID | Report | Public | 31/03/20 |
WP7 | D7.3 | In vehicle Technology Validation Download Executive Summary | PRI | Report | Public | 30/06/20 |
WP8 | D8.1 | Techno economic Evaluation | ECI | Report | Confidential | 30/09/20 |
WP8 | D8.2 | LCA technologies analyses Download Executive Summary | CID | Report | Public | 30/09/20 |
WP8 | D8.3 | Plan for the Exploitation of Results, first draft Download Executive Summary | MAV | Report | Confidential | 31/03/19 |
WP8 | D8.4 | Plan for the Exploitation of Results, final draft | MAV | Report | Confidential | 30/09/20 |
WP9 | D9.1 | Project Website Download Executive Summary | CID | Other | Public | 31/12/17 |
WP9 | D9.2 | Open Data Management Plan Download Executive Summary | CID | ORDP: Open Research Date Pilot | Public | 31/03/18 |
WP9 | D9.3 | Communication Plan Download Executive Summary | ECI | Report | Public | 31/03/18 |
WP9 | D9.4 | Plan for the Dissemination of Results, First Release Download Executive Summary | UAQ | Report | Public | 30/09/18 |
WP9 | D9.5 | Plan for the Dissemination of Results, Mid Release Download Executive Summary | UAQ | Report | Public | 30/09/19 |
WP9 | D9.6 | Plan for the Dissemination of Results, Final Release Download Executive Summary | UAQ | Report | Public | 30/09/20 |